Building Permits in ZIP 11691
Queens, NY — 339 permits filed recently
339 permits
Installation of a heavy duty sidewalk shed and pipe scaffold as per plans during new building work. no change in use, egress or occupancy. sidewalk shed & pipe scaffold to comply with chapter 33 of ny...
Installation of a heavy duty sidewalk shed and pipe scaffold as per plans during new building work. no change in use, egress or occupancy. sidewalk shed & pipe scaffold to comply with chapter 33 of ny...
Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Installation of a temporary wooden construction fence
Outriggers system installation for material hoist for facade/ roof repairs. No change in use, egress, or occupancy under this application.
Remove and replace split ac, associated piping and controls to accommodate roofing work. provide temporary cooling for the affected telecom room. provide testing for new split unit, associated piping...
Installation of outrigger platform and bracket in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Sprinkler & standpipe specifications filed in conjunction with gc application q01261189-i1
Sprinkler & standpipe specifications filed in conjunction with gc application q01261189-i1
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed 9-story mixed-use building with a cellar including 92 dwelling units and a community facility plus commercial occupancy.
Sprinkler & standpipe specifications filed in conjunction with gc application q01261189-i1
Outriggers system installation for material hoist for facade/ roof repairs. No change in use, egress, or occupancy under this application.
Proposed 9-story mixed-use building with a cellar including 92 dwelling units and a community facility plus commercial occupancy.
Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Remove and replace split ac, associated piping and controls to accommodate roofing work. provide temporary cooling for the affected telecom room. provide testing for new split unit, associated piping...
Installation of a temporary wooden construction fence
Installation of outrigger platform and bracket in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed construction fence. no change to use, egress or occupancy under this application.