Building Permits in ZIP 11434
Queens, NY — 282 permits filed recently
282 permits
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Structural steel dunnage in conjunction with hvac upgrade
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
New ceiling and minor partition alterations in conjunction with hvac upgrade
Hvac upgrade
Structural steel dunnage in conjunction with hvac upgrade
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Scope of work is solely for the installation of the solar electronicgenerating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc department of buildings.
Remove (1) one existing boiler, (1) hot water heater, (2) two new boilers and (2) hot water heaters, Replace existing plumbing three-piece fixture with new three-piece fixtures. Replace existing sink...
New bathroom in cellar, replace ceiling joist as necessary, new partition and new exterior exit.
Remove (1) one existing boiler, (1) hot water heater, (2) two new boilers and (2) hot water heaters, Replace existing plumbing three-piece fixture with new three-piece fixtures. Replace existing sink...
Scope of work is solely for the installation of the solar electronicgenerating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc department of buildings.
installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05 KW
Filed this application to resolve the summons # 039109660h & ecb violation #39109643x for one family dwelling unit. horizontal & vertical enlargement involved. obtain new c of o.
Installation of solar panels, rooftop, railed, grid-tied, 19 modules, 7.79kw
installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05 KW
Subsequent filing for plumbing work associated with alterations to the existing building.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans.
Plumbing work associated with new canopy stormwater drainage. No change to use, egress or occupancy.