Building Permits in ZIP 11412
Queens, NY — 156 permits filed recently
156 permits
Roof structural work and roofing replacement.
OT: Installation of elevator/ new entrance addition. Interior renovation including removal/ replacement of partitions, flooring, ceilings, and doors. Exterior renovation of facade including window rep...
Application filed for converting second floor from one dwelling to two dwelling units along with interior renovation. no change in bulk is proposed.
Application filed for converting second floor from one dwelling to two dwelling units along with interior renovation. no change in bulk is proposed.
OT: Installation of elevator/ new entrance addition. Interior renovation including removal/ replacement of partitions, flooring, ceilings, and doors. Exterior renovation of facade including window rep...
Curb cut application filed in conjunction with NB App. #Q01257695-I1. Propose 10.00' curb cut with 1' 6 splay (Each side) on 195 STREET 101.47' from 120 AVENUE.
Interior alteration to repair and restore existing 3 story 1 family house as shown in plans. No change in use, occupancy or egress.
Curb cut application filed in conjunction with NB App. #Q01265463-I1. Propose 10.00' curb cut with 1' 6 splay (Each side) on 195 STREET 183.24' from 120 AVENUE.
Curb cut application filed in conjunction with NB App. #Q01265463-I1. Propose 10.00' curb cut with 1' 6 splay (Each side) on 195 STREET 183.24' from 120 AVENUE.
Curb cut application filed in conjunction with NB App. #Q01257695-I1. Propose 10.00' curb cut with 1' 6 splay (Each side) on 195 STREET 101.47' from 120 AVENUE.
Interior alteration to repair and restore existing 3 story 1 family house as shown in plans. No change in use, occupancy or egress.
ST: Remove Portion of Building Facade and Portion of Existing Roof / Floor Slabs. Provide new concrete, steel, and masonry construction. No change in Use, Occupancy, or Egress.
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
Filing for temporary construction fence. No change in use, egress or occupancy.
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
Filing for temporary construction fence. No change in use, egress or occupancy.
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
Filing for temporary construction fence. No change in use, egress or occupancy.
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
ST: Remove Portion of Building Facade and Portion of Existing Roof / Floor Slabs. Provide new concrete, steel, and masonry construction. No change in Use, Occupancy, or Egress.