Building Permits in ZIP 11412
Queens, NY — 66 permits filed recently
66 permits
Application being filed to build a new metal deck at rear yard.
Application being filed to renovate existing first floor.
Installation and use of mini/spyder crane as per plans submitted. mini/spyder crane shall comply with chapter #33 of nyc building code. this application involves no change in occupancy, use or egress.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Herewith subsequently filed for installation of curb cut with application q01061188-i1.
Plumbing work in conjunction with alt-co application q01290863-i1
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Roof structural work and roofing replacement.
Installation of solar panels, rooftop, grid tied, railed, 20 modules, 8.8 KW
Application filed for converting second floor from one dwelling to two dwelling units along with interior renovation. no change in bulk is proposed.
Curb cut application filed in conjunction with NB App. #Q01265463-I1. Propose 10.00' curb cut with 1' 6 splay (Each side) on 195 STREET 183.24' from 120 AVENUE.
Interior alteration to repair and restore existing 3 story 1 family house as shown in plans. No change in use, occupancy or egress.
Curb cut application filed in conjunction with NB App. #Q01257695-I1. Propose 10.00' curb cut with 1' 6 splay (Each side) on 195 STREET 101.47' from 120 AVENUE.
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
Filing for temporary construction fence. No change in use, egress or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.28 kw
Herewith filed for minor interior renovation to an existing two-family dwelling. no change to occupancy use, egress or bulk.
Rooftop solar installation. no change to use, occupancy or egress.
application filed to rebuild existing garage;; new row of cmu blocks added to existing foundation, new framing for walls and roof, new gypsum boards.