Building Permits in ZIP 11374
Queens, NY — 183 permits filed recently
183 permits
Proposed new building , 3-story, 3-family with cellar.
Proposed new building , 3-story, 3-family with cellar
File pl worktype in conjunction with job#q01372284
File pl worktype in conjunction with job#q01372284
Interior renovation of existing store at 1st floor. no change in use, occupancy or egress
Interior renovation of existing store at 1st floor. no change in use, occupancy or egress
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Water infiltration prevention, partial facade repairs, and partial interior finish upgrade.
Mechanical for NB at PS 174 Q. PAA description in comments
Installation of temporary construction fence for ps 139q at 93-06 63rd drive, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Water infiltration prevention, partial facade repairs, and partial interior finish upgrade.
Installation of temporary construction fence for ps 139q at 93-06 63rd drive, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Mechanical for NB at PS 174 Q. PAA description in comments
Application filed for rear open deck at rear
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Ps 139q - replace 12 rooftop hvac units. no change in egress, use or occupancy.
Application filed to replace and relocate plumbing fixtures
Removal and replacement of cracked/displaced masonry and deteriorated sealant, crack repairs at existing granite panels, and repointing of existing brick masonry joints as per plans filed