Building Permits in ZIP 11373
Queens, NY — 299 permits filed recently
299 permits
Installation of Construction Fence
Installation of pipe scaffolding
Q455_Remove existing gas-fired hot water heater. Furnish and install new piping, valves, accessories, heat pump water heaters, and domestic water service as shown on the plans.
To resolve violations 34784633j, 34784635n, 39135772l, and 39135773n at cellar level. no change of use, egress or certificate of occupancy.
Installation of Sidewalk Shed
To resolve violations 39135773n at cellar level with plumbing work type as per plan filed herewith. no change of use, egress or certificate of occupancy.
Modifications or sprinkler system as per plans.
Installation of plumbing fixtures as per plans.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Interior renovation of exist. 2-family 2-story building. work on 1st & 2nd floor and roof. replace partial rear roof joists and roof surface materials. no change to exist. use, egress & occupancy.
Installation of plumbing fixtures as per plans.
Interior renovation of exist. 2-family 2-story building. work on 1st & 2nd floor and roof. replace partial rear roof joists and roof surface materials. no change to exist. use, egress & occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Modifications or sprinkler system as per plans.
Subsequence filing of plumbing work in-conjunction with OT. No change in use, egress & occupancy.
Install combined sprinkler/standpipe system as per plans filed.
Construction Equipment for Full Building Demolition
Facade repairs as per the plans filed including: Removal & replacement of parapet, brick & stone masonry units, window lintels, expansion & window frame sealant. Repairs to spalled concrete, coping, s...
Q455_Extend and paint existing concrete equipment pad. Remove existing breeching with barometric hood, spill switch, motorized damper. Cap and seal stubout and top of vent. Proivde 2 thick 4LB panel i...
Construction Equipment for Full Building Demolition