Building Permits in ZIP 11372
Queens, NY — 261 permits filed recently
261 permits
Interior renovation at apartments 5l and 5m on the 5th floor, to resolve vacate due to fire, as per plans filed herewith
Interior renovation at apartments 5l and 5m on the 5th floor, to resolve vacate due to fire, as per plans filed herewith
Installation of temporary suspended scaffold equipment.
Installation of temporary suspended scaffold equipment.
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of 3 point suspended scaffold for facade inspection repair.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Installation of 3 point suspended scaffold for facade inspection repair.
Replaced plumbing fixtures in the apt #e6r of existing 6 story building. plumbing work as per plan. no change in egress, use, or occupancy.
Replaced plumbing fixtures in the apt #e6r of existing 6 story building. plumbing work as per plan. no change in egress, use, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Application filed for facade and roof repairs as per drawings filed herewith.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Application filed for facade and roof repairs as per drawings filed herewith.
Demolish existing interior partitions and install new interior partitions; create new facade openings for storefronts per filed plans. no change to egress or occupancy.
Interior Renovation on Existing first floor and cellar in a commercial building use group 6.
Installation of plumbing fixtures as shown in plans filed herewith
Installation of plumbing fixtures as shown in plans filed herewith