Building Permits in ZIP 11367
Queens, NY — 143 permits filed recently
143 permits
Remove and replace existing gravity ventilators , provide 2 new heat split pump units , replace all refrigerant piping with insulation on the roof deck area
Propose to remove and install finishes for 2 existing bathrooms for apartment 2E all as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
Q164-Masonry, Parapets, Roof Work.
Q164-Masonry, Parapets, Roof Work.
Q164-Masonry, Parapets, Roof Work.
File to correct violation#39145553k & 39145524l at osp. no change in use, egress or occupancy.
File to correct violation#39145552z. no change in use, egress or occupancy.
File to correct violation#39145552z. no change in use, egress or occupancy.
File to correct violation#39145553k & 39145524l at osp. no change in use, egress or occupancy.
Replace (2) direct vent gas boilers (nyc boiler md 42636-03 and md 200119-04) with one (1) direct vent gas boiler as per plans. no change in use, egress or occupancy.
Filing of temporary construction fence work type in relation to application Q00914345-i1.
Repair and replace exhaust vents for direct vent gas-fired boilers as per plans. no change in use, egress or occupancy.
Repair and replace exhaust vents for direct vent gas-fired boilers as per plans. no change in use, egress or occupancy.
Filing of temporary construction fence work type in relation to application Q00914345-i1.
Replace (2) direct vent gas boilers (nyc boiler md 42636-03 and md 200119-04) with one (1) direct vent gas boiler as per plans. no change in use, egress or occupancy.
Connect to existing gas piping for one (1) replacement gas-fired boiler as per plans. cap/remove gas piping to (1) removed gas-fired boiler. no change in use, egress or occupancy.
Ps-des park drive east pump station upgrades includes construction of a new building envelope to house new electrical and mechanical equipment and site paving, grading, and drainage modifications.
'ps-des park drive east pump station upgrades includes the phased construction of a new pump station structure including concrete work below grade, cmu block above grade, and roofing.
'ps-des park drive east pump station upgrades includes the phased construction of a new pump station structure including concrete work below grade, cmu block above grade, and roofing.
Ps-des park drive east pump station upgrades includes construction of a new building envelope to house new electrical and mechanical equipment and site paving, grading, and drainage modifications.