Building Permits in ZIP 11238
Brooklyn, NY — 791 permits filed recently
791 permits
Additional footings pour, slab on grade pour
BOILER WORK TYPE TO BE FILED IN CONJUNCTION WITH ALT2#301478719. Work to be done under ALT2#301478719.
Install 8' construction fence around the perimeter
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
8'-0 high plywood fence
Interior modifications at cellar,basement, 1,2,3rd floor, to include drywall partition, drop ceiling; 10% joist replacement, sub/finish floor, skylight replacement, & address building violations, no c...
8'-0 high plywood fence
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Install 8' construction fence around the perimeter
BOILER WORK TYPE TO BE FILED IN CONJUNCTION WITH ALT2#301478719. Work to be done under ALT2#301478719.
Interior modifications at cellar,basement, 1,2,3rd floor, to include drywall partition, drop ceiling; 10% joist replacement, sub/finish floor, skylight replacement, & address building violations, no c...
Additional footings pour, slab on grade pour
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed residential 4 story new building
Hvac installation for an existing 2 family, 2 story and basement townhouse. no change in use, bulk, occupancy or egress.
Filing for mechanical modifications, installation of a new ERV unit and laundry exhaust systems. No change in use, egress of occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Subsequent structural application in conjunction with approved gc #b01240424-i1
General construction work, interior renovation as per plans filed herewith. no chnage in use, egress or occupancy. mechanical and plumbing work to be filed as subsequent filing.