Building Permits in ZIP 11238
Brooklyn, NY — 791 permits filed recently
791 permits
New 12'-0 curb cut including 2 - 1'-6 splays, to parking garage at Cellar for 86 cars, located on Fulton Street, 180'-1 1/2 east of Grand Avenue.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Application filed for interior renovations to an existing 4 story and cellar mixed use building, no change to use, egress or occupancy.
Renovation & conversion of an exisitng multi-family to single family, (4) story townhouse with cellar. new gas intallation (1 gas meter, gas range & gas piping), modification and new water/sanitary ne...
Partial demolition work in coordination with proposed Alt Co as per plans filed.
Plumbing work in conjunction with building renovation.
Mechanical work in conjunction with residential interior remodel of unit b-1b as shown on plans filed herewith. no change in use, egress, or occupancy.
Install support of excavation as per plans filed, in conjunction with alt co #b01117089-i1
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Plumbing work in conjunction with alt-co renovation and enlargement of 2-fam townhouse
Install foundation as per plans filed, in conjunction with alt co #b01117089-i1
Subsequent structural application filed herewith.
New 12'-0 curb cut including 2 18 splays to loading area, located on grand avenue 94'-11 1/2 south of fulton street.
Install underpinning as per plans filed, in conjunction with alt co #b01117089-i1
New 12'-0 curb cut including 2 - 1'-6 splays, to parking garage at Cellar for 86 cars, located on Fulton Street, 180'-1 1/2 east of Grand Avenue.
Proposed interior renovation converting existing three story and cellar into a 9 unit residential building
Interior alterations to existing 1st floor commercial space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Install sprinklers as per plans.