Building Permits in ZIP 11101
Queens, NY — 691 permits filed recently
691 permits
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work related to Covid Ventialtion upgrades.
Auditorium seating replacement, replace existing fixed seating with new fixed seating with no impact to occupancy. Install new bi-level ADA compliance drinking fountains with bottle filling station.
Proposed 4-story and cellar 6-family multiple dwelling.
Plumbing work associated with the renovation in apartments 806 and 807, including the replacement and removal of existing fixtures, and the addition of new fixtures and finishes. no change in use, egr...
General Construction related to Covd Ventilation project.
Auditorium seating replacement, replace existing fixed seating with new fixed seating with no impact to occupancy. Install new bi-level ADA compliance drinking fountains with bottle filling station.
Propose minor structural work to address full vacate order #vac q266/2024 as per plans submitted herewith. work is in conjunction with gc #q01172790-i1 & pl #q01172790-s1.
Mechanical work related to Covid Ventialtion upgrades.
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing plumbing application to include new conveyance and detention system with connection to the city sewer per site connection approval.
Proposed 4-story and cellar 6-family multiple dwelling.
Filing herewith drawings to install temporary standpipe filed in conjunction with nb filed under q00528973. this application do not require a new or amended certificate of occupancyas there is no chan...
Plumbing work associated with the renovation in apartments 806 and 807, including the replacement and removal of existing fixtures, and the addition of new fixtures and finishes. no change in use, egr...
General Construction related to Covd Ventilation project.
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Subsequent filing for plumbing work. install kitchen, bathroom, & utility room. no change in use, egress, or occupancy.
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Remove and cap existing plumbing fixtures and install a new bathroom on 1st & 2nd floor of existing commercial building. no change in use, egress and occupancy.
Installation of a heavy duty sidewalk shed to include storage.