Building Permits in ZIP 11101
Queens, NY — 688 permits filed recently
688 permits
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Mechanical work as per plans
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
install rooftop dunnage for existing condenser all as per plans filed herewith, no change to use occupancy or egress.
Renovation of an ext'gdunkin' donuts store on the 1st floor of an existing building. replace ceiling & floor tiles, lighting fixtures, wall finishes & equipment. install new interior non-load bearing...
Filing for 8' high temporary construction fence. this application is for future new building and demolition. no change in use, egress and/or occupancy.
Filed herewith for interior fit out of new restaurant in existing retail space. no change to use, occupancy or egress.
Filed herewith for plumbing application in conjunction to q01309294-i1. no change to use, occupancy or egress.
Mechanical means, submitted for use of mechanical equipment on grade, at the time of demolition
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Herewith filing architectural work as per plans. no change in use, egress or occupancy.
Renovation of an existing dunkin' donuts store on the 1st floor of an existing building. install new kx exhaust hood. no change in use, egress, or occupancy.
Full demolition to a one story building
Illuminated non-advertising accessory sign on sign band filed under job q01323876 - in property lines - mitsubishi motors. no change of use, egress or occupancy.
Mechanical plans filed in conjunction with NB Construction.
Dev HUB Job - Erect 2 Story new building.
Filing for 8' high temporary construction fence. this application is for future new building and demolition. no change in use, egress and/or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Mechanical means, submitted for use of mechanical equipment on grade, at the time of demolition