Building Permits in ZIP 11101
Queens, NY — 691 permits filed recently
691 permits
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Plumbing alteration associated with 5th floor tenant interior renovation. no change to use egress or occupancy.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Plumbing alteration associated with 5th floor tenant interior renovation. no change to use egress or occupancy.
Additions/Modification to the existing sprinkler system on the 3rd floor as per plans. No change to use, egress or occupancy.
Herewith filing for New seismic braces installation for Gas pipes. No change in use Egress of Occupancy.
Temporary shoring & bracing and partial demolition for the 1st floor opening to install new ramp going down to the cellar.
Filing for 8' high temporary construction fence. this application is for future new building and demolition. no change in use, egress and/or occupancy.
Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.
Installation of interior partitions at the ground floor
Installation of interior partitions at the ground floor
Temporary shoring & bracing and partial demolition for the 1st floor opening to install new ramp going down to the cellar.
Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.
Herewith filing for New seismic braces installation for Gas pipes. No change in use Egress of Occupancy.
Repair or replace damaged sections of concrete walkways; remove and replace settled soils around perimeter of building to restore grade levels, repair minor interior slab on grade cracks in basement.
Installation of a temporarily supported scaffold, heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a...
PLUMBING WORK ON 2ND FLOOR BEAUTY SALON OF EXISTING 2-STORY BUILDING AS PER PLANS FILED HEREWITH, RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. AND THIS FILING IS IN CONJUNCTION WITH ALT...