Building Permits in ZIP 10469
Bronx, NY — 254 permits filed recently
254 permits
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Renovate existing part 1st floor commercial space for a new eating & drinking place for 'zaxby's'. install non load-bearing partitions, exterior wall finish, kitchen equipment, hood, exhaust & replace...
Subsequent filing in response to plumbing inspector's comments on 10/23/2025 to revise application accordingly.
Renovate existing part 1st floor commercial space for a new eating & drinking place for 'zaxby's'. install non load-bearing partitions, exterior wall finish, kitchen equipment, hood, exhaust & replace...
Ms subsequent filing for job# x01338009-i1 for 1st floor zaxby restaurant. modify existing rtu & hvac and kitchen exhaust system thru roof. no change i use, egress or occupancy.
Subsequent filing in response to plumbing inspector's comments on 10/23/2025 to revise application accordingly.
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
Install two direct vent gas boilers.
X076: Auditorium and Path of Travel upgrades including inclined platform lift, drinking fountain, area drain repair, perimeter gate installation and acoustical paneling.
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
X076: Structural work - Lengthen landing of existing concrete ramp by 18 & Modify stage stairs to accommodate platform lift
Exterior facade repairs and waterproofing, brick replacement, lintel/spandrel repairs, sill repairs, pointing. No change in use egress or occupancy
X076: Auditorium and Path of Travel upgrades including inclined platform lift, drinking fountain, area drain repair, perimeter gate installation and acoustical paneling.
Install two direct vent gas boilers.
X076: Structural work - Lengthen landing of existing concrete ramp by 18 & Modify stage stairs to accommodate platform lift
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
The scope of the structural work is strictly repair and maintenance from normal wear and tear. the structural design work does not constitute a change of use or addition to the existing building.
The scope of the structural work is strictly repair and maintenance from normal wear and tear. the structural design work does not constitute a change of use or addition to the existing building.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.