Building Permits in ZIP 10454
BRONX, NY — 80 permits filed recently
80 permits
Complete repairs of fire-damaged apartment #6H, including 18 fire-damagedroof joists replacement above #6H. No change in use, egress or occupancy.
Installation of heavy duty side walk shed.as per plan.
Installtion of light duty side walk shed at front as per plan
Installation of one (1) new gas boiler in cellar
This application is filed for the installation of one (1) gas boiler in cellar
provide new 100 gallon rooftop fuel storage tank w/ containment for hand fill as indicated on plans & per BB 2011-001 for buildings constructed prior to 1968. No change to use, egress or occupancy.
Installation of heavy duty side walk shed.as per plan.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Scope of work is solely for the installation of the solar electronic generating system.all other work is not to be relied upon as being approved and/or permitted by thenyc department of buildings.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Filing for the installation of construction fence on behalf of contractor
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
SITYARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Mitchel Bldg 04, Exterior facade & roof repairs: Removal/replacement/repairs to roofing system, cracked masonry, spalled concrete, spandrel beams, windows sill & sealant, and roof drains. Masonry pinn...
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Support of excavation
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.