Building Permits in ZIP 10467
Bronx, NY — 354 permits filed recently
354 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Replacement of roof dunnage for new heat pump units. Installation of new concrete pad for outdoor unit for new split system for BlackBox Theater.
Modifications of existing building ventilation system to provide ventilation for all classrooms and offices.
X425, installation of +/- 173 linear feet of temporary 8 feet high chain link fence submitting on behalf of contractor in conjunction with dob # x00589260. no change in use, egress or occupancy.
Facade repair, includes reconstruction of front parapet wall.
Facade repair, includes reconstruction of front parapet wall.
Replace oil fired boiler with gas/oil fired boiler. change grade of fuel oil from #4 to #2.
Sprinkler application filed herewith in conjunction to alt-co application x01201440-i1
Plumbing work in conjunction with NB application #X01178301-I1
Plumbing work in conjunction with NB application #X01178301-I1
Replace oil fired boiler with gas/oil fired boiler. change grade of fuel oil from #4 to #2.
Construction of construction of trellise at rear yard to address ecb violation # 39146001r.
Install chimney liner per plans.
Installation of Pump Jack Scaffolding In conjunction with DOB NOW Job Number X01208498-I1
Construction of construction of trellise at rear yard to address ecb violation # 39146001r.
Installation of Pump Jack Scaffolding In conjunction with DOB NOW Job Number X01208498-I1
Install chimney liner per plans.
X425, installation of +/- 173 linear feet of temporary 8 feet high chain link fence submitting on behalf of contractor in conjunction with dob # x00589260. no change in use, egress or occupancy.
Modifications of existing building ventilation system to provide ventilation for all classrooms and offices.