Building Permits in ZIP 10466
Bronx, NY — 335 permits filed recently
335 permits
Plumbing work in conjunction with NB application #X01096395-I1
Erect illuminated accessory business wall sign juici patties w/logo on backer panel as per drawing file herewith.
Replacement of 7.5 ton rooftop unit. no change to egress, use, or occupancy.
Filing application for the installation of a new temporary plywood fence required to provide protection during the construction of a new service door on the exterior wall. There is no change in use, e...
Filing application for the installation of a new temporary plywood fence required to provide protection during the construction of a new service door on the exterior wall. There is no change in use, e...
Plumbing work in conjunction with NB application #X01096395-I1
Erect illuminated accessory business wall sign juici patties w/logo on backer panel as per drawing file herewith.
Replacement of 7.5 ton rooftop unit. no change to egress, use, or occupancy.
Sprinkler work in conjunction with NB application #X01096060-I1
Replacement of existing entry ramp at main entrance
Sprinkler work in conjunction with NB application #X01096060-I1
Replacement of existing entry ramp at main entrance
Herewith filing for interior renovation and a new service entrance as per plans for the new restaurant. No change in use, egress, or occupancy.
Herewith filing mechanical for new HVAC unit and duct reconfigurations per plans. No change of use, egress, or occupancy.
Installation of 3 New light poles to playground
Montefiore - 4e acute inpatient rehab reno - modifications to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy.
Interior renovation to the bathrooms and kitchens on the first, second, and third floors. No change in use, egress, or occupancy.
Repair to existing stairs and door located in the basement. No change to use, occupancy or egress
Installation of 3 New light poles to playground
Montefiore - 4e acute inpatient rehab reno - modifications to existing sprinkler system as per plans filed herewith. no change in use, egress or occupancy.