Building Permits in ZIP 10463
Bronx, NY — 420 permits filed recently
420 permits
In apt 6bc replace sink, remove stove and install new gas dryer in existing kitchen being converted to a laundry room. replace stove, sink and install new dish washers in ex. kitchen.
Construction fence installed to protect site during new building construction. filed in conjunction with NB applications: X01173147-I1, X01173155-I1, X01173166-I1, X01173176-I1, X01173179-I1, X0117318...
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
In apt 6bc replace sink, remove stove and install new gas dryer in existing kitchen being converted to a laundry room. replace stove, sink and install new dish washers in ex. kitchen.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Construction fence installed to protect site during new building construction. filed in conjunction with NB applications: X01173147-I1, X01173155-I1, X01173166-I1, X01173176-I1, X01173179-I1, X0117318...
Replace plumbing fixtures in Units 105, 107 & 108, including toilets, lavatories, tubs, sinks & dishwashers. Includes fixture-for-fixture swaps and new bathroom in Unit 105 (toilet, lav, tub) and new...
Plumbing specifications filed in conjunction with gc application x01228219-i1
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Plumbing specifications filed in conjunction with gc application x01228219-i1
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Replace plumbing fixtures in Units 105, 107 & 108, including toilets, lavatories, tubs, sinks & dishwashers. Includes fixture-for-fixture swaps and new bathroom in Unit 105 (toilet, lav, tub) and new...
(please assign to dev hub) PROPOSED 7 STORY MIXED USE BUILDING
(please assign to dev hub) PROPOSED 7 STORY MIXED USE BUILDING
Install an accessory business illuminated set of channel letters janovic ^ benjamin moore
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code. no change in use, egress or occupancy under this application.
Magni used to hoist and load formwork, rebar, wire mesh, material and concrete trowel machines