Building Permits in ZIP 10459
Bronx, NY — 253 permits filed recently
253 permits
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Construction Fence filed in conjunction with NB Application #X01180882-i1
Construction Fence filed in conjunction with NB Application #X01180882-i1
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Application to convert existing single family into two class A dwelliing residential building.
Application to convert existing single family into two class A dwelliing residential building.
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: X00992202 and related application: VT -X00992202-S3.
Fuel Storage MULTI-COMPONENT RENOVATION (FDNY EC82 PHASE 2). REMOVAL AND REPLACEMENT OF DISEL FUEL DISPENSING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Fuel Storage MULTI-COMPONENT RENOVATION (FDNY EC82 PHASE 2). REMOVAL AND REPLACEMENT OF DISEL FUEL DISPENSING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: X00992202 and related application: VT -X00992202-S3.
Foundation & earthwork application filed in conjunction to the nb application
Foundation & earthwork application filed in conjunction to the nb application
(please assign to dev hub) PROPOSED NEW 7 STORY RESIDENTIAL BUILDING
Plumbing Work Multi-Component (EC 82 PHASE 2) no change of use, egress, or occupancy under this application. See comment#24
Flood repair renovation. Install new GAS Boiler as per plans for existing Firehouse (EC82 Phase 1). No change of use, egress, or occupancy under this application.
Flood repair renovation. Install new GAS Boiler as per plans for existing Firehouse (EC82 Phase 1). No change of use, egress, or occupancy under this application.
Plumbing Work Multi-Component (EC 82 PHASE 2) no change of use, egress, or occupancy under this application. See comment#24
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Filing plumbing work type in conjunction with alteration job:x07999930-i1