Building Permits in ZIP 10455
Bronx, NY — 342 permits filed recently
342 permits
Alteration for new article 28 clinic. work to include erecting new interior load bearing partitions, modifying suspended ceilings as required. new installation of new wall, floor, and ceiling finishes...
Alteration to existing office for new article 31 clinic. work to includ erect new interior load bearing partitions, modify suspended ceilings as required. installation new installation of new wall, fl...
Filing herewith for plumbing work associated with the renovation of Article 31 Medical Office Space. Work to include, but not limited to, new fixtures and related plumbing. No change in use, egress, o...
Filing herewith for plumbing work associated with the renovation of Article 28 Medical Office Space. Work to include, but not limited to, new fixtures and related plumbing. No change in use, egress, o...
Proposed renovation of existing apartment building. Remove all existing roofing and sheathing at main roof, and bulkhead roof. No change of use, egress or occupancy under this application. See comment...
Mechanical work filed for New Building application.
Adjust existing mechanical systems on levels lobby, 7,8 & 9 to new zeta schoolbackgrounds. new mechanical equipment to be provided to cover the remainder of the load requirements. new energy recovery...
Filing herewith plans for the installation of a temporary construction fence. No change to use, egress, or occupancy.
Installation of an illuminated business accessory sign . no change in use, egress or occupancy.
Filing herewith plans for the interior fit-out of a McDonalds restaurant. No change to use, egress, or occupancy.
Filing herewith plans for mechanical work including commercial kitchen rangehood ventilation system, and associated ductwork and finishes. All work associated with the interior fit-out of a McDonalds...
Mechanical work filed for New Building application.
Filing herewith plans for the installation of a temporary construction fence. No change to use, egress, or occupancy.
Filing herewith plans for the interior fit-out of a McDonalds restaurant. No change to use, egress, or occupancy.
Adjust existing mechanical systems on levels lobby, 7,8 & 9 to new zeta schoolbackgrounds. new mechanical equipment to be provided to cover the remainder of the load requirements. new energy recovery...
Installation of an illuminated business accessory sign . no change in use, egress or occupancy.
Filing herewith plans for mechanical work including commercial kitchen rangehood ventilation system, and associated ductwork and finishes. All work associated with the interior fit-out of a McDonalds...
Construction fence application being filed for new building
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant
Cap and remove illegal plumbing fixtures in cellar as per plans. no change in use, egress or occupancy is involved under this application.