Building Permits in ZIP 10452
Bronx, NY — 471 permits filed recently
471 permits
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Mechanical equipment use for partial demo (bobcat s250 skid-steer loader, hyundai r210lc-9 hydraulic excavator, brokk 110 hydraulic breaker, jlg 650 boom lift (or equivalent approved by engineer) for...
Mechanical equipment use for partial demo (bobcat s250 skid-steer loader, hyundai r210lc-9 hydraulic excavator, brokk 110 hydraulic breaker, jlg 650 boom lift (or equivalent approved by engineer) for...
Sh/ps104x - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with llw#130994 no change in use, occupancy or egress
Sh/ps104x - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with llw#130994 no change in use, occupancy or egress
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Herewith Filing for the Installation of a Sprinkler and Standpipe System in conjunction with NB Application X08008823.
Herewith Filing for the Installation of a Sprinkler and Standpipe System in conjunction with NB Application X08008823.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replace existing plumbing fixtures with new (water closet, lavatory, bathtub, kitchen sink). replace existing roof drains with new. replace existing gas ranges with new. revise domestic water piping i...
Filing SE drawings in conjunction with the GC application, job #X01250818-I1.
Structural Repair work. No change to use, egress, or occupancy.
Structural Repair work. No change to use, egress, or occupancy.
Replace existing plumbing fixtures with new (water closet, lavatory, bathtub, kitchen sink). replace existing roof drains with new. replace existing gas ranges with new. revise domestic water piping i...
PAA requested because the SOE drawings have been updated.
Replacement of existing storefront systems and exterior windows with new aluminum storefront framing. Installation of EIFS assembly at portions of the exterior faade as shown on drawings. Install new...
PAA requested because the SOE drawings have been updated.
Replacement of existing storefront systems and exterior windows with new aluminum storefront framing. Installation of EIFS assembly at portions of the exterior faade as shown on drawings. Install new...
(please assign to the dev hub) PROPOSED NEW 8 STORY BUILDING
Construction fence filed in conjunction with the NB application #X01249518.