Building Permits in ZIP 10452
Bronx, NY — 471 permits filed recently
471 permits
Application herewith filed for SOE in conjunction with NB job number X01263390-I1
Cap and removed cellar shower pipes on wash room and legalize the toilet and sink on cellar.
Proposed new 26 story mixed used building (hub consultation meeting took place on 10/24/2023 with dbc rami bitar)
(please assign to dev hub, to the same examiner as job #X01233373-I1 as this is one zoning lot with the same owner and applicant ) PROPOSED NEW 13 STORY BUILDING
Structural plans for the new 8-Sty residential building
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Structural plans for the new 8-Sty residential building
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
(please assign to dev hub, to the same examiner as job #X01233373-I1 as this is one zoning lot with the same owner and applicant ) PROPOSED NEW 13 STORY BUILDING
Proposed new 26 story mixed used building (hub consultation meeting took place on 10/24/2023 with dbc rami bitar)
Footing and foundation plans for the proposed 11-Sty building filed under the lead application
Footing and foundation plans for the proposed 11-Sty building filed under the lead application
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.