Roofing Permits in Queens, New York
1,423 roofing permits filed recently
1,423 permits
Installation of solar system on the roof of garage as per plan. No change in use, egress or occupancy
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Exterior Renovation including masonry repair, roof replacement, window replacement, and exterior door replacement. No change in use, occupancy, or egress.
Waterproofing at sidewalk as per plan. no change in use, egress or occupancy.
Remove gas generator. cap and remove existing gas line at basement facade and roof. no change in use, egress or occupancy.
P.S. 244-q: Replacing Gas fired roof top HVAC units with roof top Electric Heat pump HVAC units.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for ba...
Propose interior renovation on cellar, roof. 1st thur 2nd floor. plumbing & gas works as per plan. no change in use, bulk, egress or occupancy.
Proposed roof replacement as per plans submitted herewith. there is no change in use, egress or occupancy.
P.S. 244-q: Replacing Gas fired roof top HVAC units with roof top Electric Heat pump HVAC units.
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for ba...
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Proposed roof replacement as per plans submitted herewith. there is no change in use, egress or occupancy.
Propose interior renovation on cellar, roof. 1st thur 2nd floor. plumbing & gas works as per plan. no change in use, bulk, egress or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Direct replacement of rooftop unit
Installation of solar panels, rooftop, grid tied, railed, 20 modules, 8.8 KW
Roof structural work and roofing replacement.