Roofing Permits in Queens, New York
1,413 roofing permits filed recently
1,413 permits
Installation of solar panels, rooftop, railed, grid-tied, 13 modules, 5.33kw
Installation of solar panels, rooftop, railed, grid-tied, 12 modules, 5.28kw
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Solar tax installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Rooftop solar installation. no change to use, occupancy or egress.
Remove and replace with new interior doors, replace floor and wall tiles of bathroom, Kitchen and locker room for STW( ( Sewage Treatment Workers) of Service Building at Bowery Bay , WRRF. Repair of H...
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
REMOVE EXISTING RTU & INSTALL (3) replacement SINGLE PACKAGE UNITS ON 2nd floor & 3rd floor ROOF with EXISTING ROOF DUNNAGE & DUCT WORK FOR 213-33 39 AVE LOBBY, SUITE 302 & 320
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Installation of photovoltaic solar array on existing roof system as per plans
Rooftop solar installation. no change to use, occupancy or egress.
Rooftop solar installation. no change to use, occupancy or egress.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
REMOVE EXISTING RTU & INSTALL (3) replacement SINGLE PACKAGE UNITS ON 2nd floor & 3rd floor ROOF with EXISTING ROOF DUNNAGE & DUCT WORK FOR 213-33 39 AVE LOBBY, SUITE 302 & 320
Installation of photovoltaic solar array on existing roof system as per plans
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Installation of solar panels, rooftop, railed, grid-tied, 12 modules, 5.28kw