Plumbing Permits in Queens, New York
1,705 plumbing permits filed recently
1,705 permits
File pl worktype in conjunction with job#q01115205
New 3 piece bathroom in cellar and bar sink to be capped; removal of bathtub and installation of shower on second floor with new washer and dryer on second floor. removal of shower and installation of...
Application filed for plumbing work at cellar in exist. 2 story, 2 family bldg. to address violation# 34417369p. filed in conjunction w/ application# q00791065-i1. all work is as per plans submitted h...
Plumbing work in the cellar in conjunction with gc #q01263107-i1 to replace 2-piece bathroom & remove shower; new sink & washer/dryer; and close violations.
Here with to file the application for plumbing and sprinkler work in conjunction with the new building q08036501. as per plan, no change in occupancy, use, or egress.
Filing for installation of awning/signage for existing commercial establishment. Master Plumbers Council of the City of New York
Res - Demo: (1) Shower, (2) WC, (2) Lavatories, (1) kitchen sink, Add: (1) Shower, (2) Lavatories, (2) WC, (1) Tub, (1) Kitchen Sink, (1) Dishwasher Com - Demo (2) Sinks, (1) WC, (1) Lavatory, Add: (1...
Here with to file the application for plumbing and sprinkler work in conjunction with the new building q08043112. as per plan, no change in occupancy, use, or egress.
Removal of kitchen sink & three (3) batrhoom fixtures within cellar in order to legalize violation #35076705z.
New 3 piece bathroom in cellar and bar sink to be capped; removal of bathtub and installation of shower on second floor with new washer and dryer on second floor. removal of shower and installation of...
Herewith filing plumbing work application for exist. two family two story residential building.
File pl worktype in conjunction with job#q01115205
Subsequent filing for pl work in conjunction with job# q01362928-i1. install plumbing fixtures for bww-go. no change in use, egress or occupancy.
To propose new/replace kitchen equipments and new bathroomfixtures as per plans filed herewith. no change of use, egress oroccupancy.
Proposed bathroom and replacement of the washer and dryer in the cellar, proposed kitchen and bathroom and dishwasher in the first floor, proposed two bathroom and washer and dryer in the second floor
File pl worktype in conjunction with job#q01355193
To relocate/replace/new kitchen, remove partitions, and new walls at first floor and cellar in conjunction with dobnow plumbing #q01364912-s1. no change of use, egress or occupancy.
Application filed to replace and relocate plumbing fixtures
Proposed Plumbing & Sprinkler work only at Cellar, 1st Thru 3rd Floor as per plan.
Application file to legalize existing 3pc Bathroom, laundry area (washing machine and non-residential sink). Remove illegal fixtures from cellar level-Elec-stove. File to Resolve ECB//DOB Violations #...