Plumbing Permits in Queens, New York
1,726 plumbing permits filed recently
1,726 permits
Modify existing plumbing, install new fixture & relocate existing plumbing fixtures as per plan file
Cap and remove illegal shower, gas dryer. install back 2pc bathroom. remedy ecb violations 39169157p;35677005l;35677006n;35665964z;35665963r. no change of use, egress and occupancy.
P.S. 244-Q: Replace gas fired water heater with heat pump water heater. Gas kitchen equipment will be replaced with electric type. Remove all gas piping and gas meter assembly. CONTINUE IN COMMENTS SE...
Cap and remove illegal shower, gas dryer. install back 2pc bathroom. remedy ecb violations 39169157p;35677005l;35677006n;35665964z;35665963r. no change of use, egress and occupancy.
Proposing Plumbing , Standpipe and Sprinklers work for entire Mix Use New Building
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Filing to add/modify the plumbing and sprinkler fixtures for Bank of America.
Install pl & sp worktype in conjunction with job# q01202953
Install pl & sp worktype in conjunction with job#q01202950
Modify existing plumbing, install new fixture & relocate existing plumbing fixtures as per plan file
Plumbing and gas work for existing one family dwelling. no change in use, egress and occupancy.
Herewith filing plumbing work in conjunction with nb
Subsequent plumbing application.
File pl & sp worktype in conjunction job #q01202951
This application is filed to add a new plumbing work type in conjunction with a new building application
Herewith filing for plumbing modifications as per plans.
Plumbing work on proposed commercial space with relocate/replace/new bathroom fixtures, sprinkler heads as per plan. no change of use, egress or occupancy.
Proposed plumbing work on cellar and first floor for Supermarket. No change to occupancy use or egress.
Plumbing alteration associated with 5th floor owner interior renovation. no change to use egress or occupancy.
Plumbing and sprinkler modifications to accommodate alterations for new medical offices at the 2nd floor as per plans. no change to use, egress or occupancy.