Renovation Permits in Manhattan, New York
4,119 renovation permits filed recently
4,119 permits
This Alteration application is being filed for the sprinkler work in conjunction with Alt CO application #M01178590-I1. There are no change in use, egress or occupancy under this application.
Interior renovation of existing eating and drinking establishment on the basement and first floor as per CO 120819061. No changes to use, egress or occupancy.
Interior renovation on first floor as indicated on plans filed herewith. no change in use egress or occupancy under this application
Interiro renovation existing dwelling with partition work on 1st floor. no change in use, egress or occupancy.
Interior renovation of existing retail store to deli store. Remove and install partition walls, refrigeration units, exhaust system, finishing floor, walls and ceiling as per plans. No change in egres...
Interior renovation of apartment 706 on the 7th floor. no change to use, egress, or occupancy.
Interior Renovation of Apt. 12D at the 12th floor, including general construction work. No change to egress, use or occupancy. The proposed work has no effect on the structural stability of existing b...
Interior renovation of apartment 1120 on the 11th floor. no change in use, egress, or occupancy.
Facade alteration as per plans. No change to egress, use, or occupancy.
Interior renovation of apt #20C. New finishes & millwork, replacement of kitchen & bathroom fixtures & appliances (filed under separate DOB application). Replace windows in existing opening. New LED i...
Interior renovation at 001 floor store with general constructionwork asperplanfiledherewith . no change of use, egress orcertificate of occupancy.
Interior renovation of mechanical systems as shown on filed plans
Tisch Hospital - Limited mechanical alterations to restroom and shower areas on the 7th, 16th, and 17th floors, including exhaust and air distribution modifications. No change to use, occupancy, or eg...
General construction for interior renovation of Apartment 9C on the 10th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
Interior renovation of the existing retail store. no change in use, egress and occupancy
Minor repair at the joint between the existing rear facade and the existing rear extension. Work to be done from exterior. No interior work.
Interior renovation of apartment 2d on the 2nd floor. no change in use, egress or occupancy.
Interior renovation, ptac unit replacement, new condenser and ptac unit below window, new air handler in apt. #3b. no change of use, egress or occupancy.
General construction & structural work for existing cellar joist repairs and temporary bracing during repairs as per plans filed herewith. no change in use, egress or occupancy. all work in cellar onl...
General construction for interior renovation of Apartment 3A on the 4th floor as shown on drawings filed herewith. No change in use, egress or occupancy.