Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Renovation of existing triplex apartment. this alteration will consist of the renovation of bathrooms and general partition walls as per plans. no change to use, egress or occupancy.
Exterior facade repairs including brick rebuilding, parapet rebuilding, cut and point, lintel replacement and window sill repairs
INSTALLATION OF APPROXIMATELY +/-536LF - 12'W x 14'H and +/- 176 LF - 12'W x 20'H TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR EXTERIOR FACADE REPAIR WORK. NO CHANGE IN USE, EGRESS OR OCCUPANC...
Interior renovation of Atria (Senior Living Facility) Associated with the Mechanical work scope.
REPLACEMENT OF ALL EXTERIOR DOORS AND WINDOWS. INTERIOR RENOVATIONS TO WAL LPARTITIONS, MILLWORK as shown on plans filed herewith. No change to use, egress or occupancy
Interior renovation of existing medical office msh imi 5
Suspended scaffold plans for facade repairs and inspections
Renovation of an existing apartment on the 12th floor. no change of use, occupancy or egress under this application.
Minor structural repair/replacement at non-street facade. new openings/new lintels and skylights/framing. no change to use, egress nor occupancy.
Interior renovations as per plans filed herewith. No change to use, egress or occupancy.
Alteration of existing Workroom/Dry lab to a new Shared Tissue Culture Lab on the 4th floor room RL-430. New equipment, patching & repairing of existing surfaces, new flooring & wall finishes, and new...
Repair/replace facade to include masonry, pointing, lintels, sills, limestone patching, coping stones, repairs to the parapet, scrape/prime/paint exposed steel, and caulking.
Foundation, exterior ramp, and parapet repair
Ground floor retail upgrades for alteration type 2. work limited to inside the demised premises only on approximately 1,100 gsf of impacted retail area. there shall be no change of use, no change of o...
Interior demo of partitions walls and interior renovation of apartment 4j
Interior renovation and installation of commercial exhaust system for take out pizzeria, no change in use occupancy or egress
Alterations to existing mechancial systems as per plans filed herewith
Application being filed for interior apartment renovation of apt 4G on the 4th floor. Work to include installation of a through wall AC Unit. No change in use, egress, or occupancy.
Hereby filing to remove and relocate sprinkler heads for bathroom renovation with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
Proposed garage repairs as indiated on plans submitted herewith. there is no change in use, egress or occupancy.