Renovation Permits in Manhattan, New York
4,172 renovation permits filed recently
4,172 permits
HP SP: Modifications to ceilings and finishes to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS AND CONVERSION FROM EXISTING COMMERCIAL BUILDING INTO A 8 FAMILY 4 STORY AND CELLAR RESIDENTIAL BUILDING. (All new interior finishing's & MEP, SP, P...
Renovation of the mechanical room at the cellar
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 4th floor (corridor bathroom and freight lobby as per plans filed herewith. no change in...
Renovation of mechanical equipment at cellar mechanical equipment room as shown on drawings provided.
Structural alterations as per plans including tenant communicating stair and equipment support. No change to use, egress, or occupancy.
Filing herewith interior renovation of existing apartments 8ORT, 3J, 4RT and 11K as per plans.
Structural and foundation work in conjunction with alteration of existing 1-family dwelling
Structural scope associated with the renovation of the terrace on the 21C/22M floor in compliance with the BB 2018-002. No change of use, egress or occupancy.
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and precipitator as per plan. no change in use, egress, or occupancy.
Structural repairs located at the garage as indicated on plans. no change to occupancy, use or egress.
Remodel apt 4c on the 3rd floor, apt 5a on the 4th floor and apt 6a on the 5th floor. no change in use, egress or occupancy.
Herewith filing for interior renovation of exisitng apartment # 2 as per plans.no changes to use, egress or occupancy.
Alteration CO application filed to convert existing commercial store building to an eating & drinking establishment as per plans filed.
Remodel rear apt on basement level and relocate stairs to recreation room. no change in use, egress or occupancy.
Interior renovation of existing apartment (#8W) on the 8th floor. No change to use, egress or occupancy.
Modifications to existing Sprinkler/Standpipe system related to Kitchen and Restaurant renovation per plans.
Filing herewith general construction to include interior renovation to existing apartment 7V as per plans submitted.
Remodel rear apt on basement level and relocate stairs to recreation room. no change in use, egress or occupancy.
Renovation of existing building lobby, including finishes and entrance vestibule. Minor alterations to adjacent retail tenant storefronts. No change in use, egress or occupancy.