Renovation Permits in Manhattan, New York
4,129 renovation permits filed recently
4,129 permits
Dome framing repairs as per plans filed herewith. no change to use, egress or occupancy.
Interior renovation of existing apartment including the removal & installation of non-load bearing partitions, floor & wall finishes as per the drawings filed herein. no change in use, occupancy or eg...
Mechanical modifications to inculde interior renovation on the 8th floor, as per drawings filed herewith. no change in use, egress or occupancy.
Apartment renovation 10 C. No change to occupancy, use or egress under this application.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
ALT-CO filed herewith to renovation of existing multifamily residential building, 4 stories over basement plus cellar to obtain the new certificate of occupancy.
Interior renovation of apt. 35d on the 35th floor. no change to use, egress, or occupancy.
Kitchen, bathroom and one bedroom interior renovation of apt. #5f. no change of use, egress or occupancy.
Subsequent application for foundation and structural work. alterations to elevator pit/shaft framing, masonry wall.
structural work associated with the townhouse renovation, as shown on plans filed herewith. No change to use, egress, or occupancy.
Local law 11 repairs. inspections. facades restoration.
Interior renovation of apartment 19j. partition changes tonon-load-bearing walls as per plans. no change in use,occupancy or egress.
Exterior facade repair work as shown on plans.
Facade repairs to comply with ll 11/98. no change in use, egress or occupancy.
Alteration of an existing apartment unit #11a with new partitions, finishes, and appliances. minor window work on secondary facades. no change in use, egress, or occupancy.
Interior renovation of the 5th floor totaling approximately 9, 276 s.f. as per drawings herein. no change to use, egress, or occupancy involved under this application.
Alterations to sprinkler system on 15th floor as per plans. No change to use. egress or occupancy.
Interior renovation of apt 1c, 3c, 4b. partition changes to non-load-bearing walls as per plans. installation of new skylight. no change in use, occupancy, or egress.
Facade repairs as shown on plans no change to egress, occupancy or use.
Mechanical work in conjunction with apartment renovation.