Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Added aditional facade restoration inspection (in conjunction with sr22-349) additional repair location added
Sprinkler work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. modify existing sprinkler system for new apartment layout. install sprinkler heads and piping. install...
Interior renovation. no change to use, egress or occupancy.
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Herewith filing for interior renovations at the 16th flr infusion center per plans. no change in use, occupancy, or egress under this application.
Repair and restore facades and fire escapes as noted in the attached plans. No changes in egress or occupancy under this application.
Structural slab repairs and associated framing on 3nd floor as per plans filed herewith. No changes in use, egress or occupancy.
Repair and restore facades and fire escapes as noted in the attached plans. No changes in egress or occupancy under this application.
General construction architectural for the renovation of apartment 3d on the 3rd floor as per plans filed herewith. no change of use, egress, or occupancy.
Repair and restore facades and fire escapes as noted in the attached plans. No changes in egress or occupancy under this application.
Repair of existing sidewalk vault as shown herewith. No changes to egress, occupancy or use.
Change of use and occupancy in cellar from warehouse (ug 16) to retail and business (ug vi). interior renovations in cellar. renovations to 1st floor loading dock and loading dock facade. filed in con...
Filing for facade repairs work that includes replacement of precast concrete window sill(s), replacement of cracked brickwork, replacement of terracotta copings, repair of eroded mortar joints, and mi...
Interior renovation of apt 6h. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Alteration application is being filed for the structural work at the subject premises. Interior masonry repair, sistering, reinforcement, dunnage and new steel opening. No change in use, egress or occ...
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
INSTALLATION OF NEW MECHANICAL SYSTEMS IN ASSOCIATION WITH TOWNHOUSE RENOVATION, INSTALL NEW VRF HEAT PUMPS AND ASSOCIATED PIPING AND DUCTWORK. INSTALL NEW ERVVENTILATION SYSTEM. No change to use, egr...
The scope of work consists of repairing loose and missing veneer components of the building envelope. No change in use, egress, or occupancy.
At first floor, modification to egress and egress door/facade assembly as per ccd1 #pda00004108. alternate egress only approved as temporary egress durng lobby renovation and is to be restored to orig...