Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Alteration of sprinkler and standpipe system associated with Alt-CO M01237433-I1.
Interior renovation of apartment 2g/h as per plan. no change in use, egress or occupancy.
Facade repairs as per plans. no change in use, egress or occupancy.
Propose renovation of mercantile area: new finishes applied to existing partitions & new retail fixtures. no change in use, egress, or occupancy.
Office renovation work work to include partion, ceiling and door modifications to stairwell enclosure work as indicated on plans. no change in use, egress or occupancy,
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Interior renovation of the apartment including wall and floor finishes and partition work as shown on plans filed herewith. there is no exterior work proposed. no change to use, egress, or occupancy.
Fisp repairs to include brownstone replacement, brick replacement, brick repointing, window limit stop replacement, sill repair, lintel restoration. no change in use, egress or occupancy.
Masonry facade repairs as per plans. No change to use, egress, or occupancy.
Work includes sounding the entire street facing facade, remove and replace defective stone with new pre-cast stones, repainting the cornice, repair unsound stucco, and recoating the masonry with a pro...
alterations to existing SP Systems as per plans filed herewith
Alteration of sprinkler and standpipe system associated with Alt-CO M01237433-I1.
Renovation of # PHGC on 6th and 7th floor with partition work as per plan. No change in use, occupancy or exit.
Garage repairs at the cellar, first floor, and garage entrance/exit as per plans filed herewith. No change in use, egress, or occupancy.
Interior renovation as shown. no change in use, occupancy or egress. no alterations of structural system or exterior of the building
Interior renovation of apartment 2g/h as per plan. no change in use, egress or occupancy.
Work includes sounding the entire street facing facade, remove and replace defective stone with new pre-cast stones, repainting the cornice, repair unsound stucco, and recoating the masonry with a pro...
Office renovation work work to include partion, ceiling and door modifications to stairwell enclosure work as indicated on plans. no change in use, egress or occupancy,
Facade repairs as per plans been filled herewith.
Proposed exterior facade repair (parapet, lintel, caulking, brick replacement, masonry, mortar joint pointing) no structural changes as per plans. no change in use egress or occupancy. related to loca...