5,430 renovation permits filed recently
5,430 permits
Herewith filing for interior modifications in units 7c & 10c as per plans. no change to use occupancy or egress.
Repair of existing fire rated walls in common hallways
Limited interior work to create a new doorway and kitchen pass as per the drawings filed herein. no change in use, occuprancy or egress.
Install 3 ceiling mounted PTAC units and related ductwork, an exhaust fan and new diffusers in conjunction with the interior apartment renovation, as per plans filed herewith. No change to use, egress...
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans,
Addition and modification to exsiting sprinkler system as shown herewith. no changes to egress, occupancy or use
Interior renovation of existing apartment on the 18th floor Apt#18J. Architectural/construction work only.
Facade repairs as per plans. No change to use, egress or occupancy.
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and painting. No proposed cha...
Herewith filing for structural lightwell repair at 1st & 2nd floor as per plans filed herewith. no change in use, occupancy or egress.
Interior removals work on the 55m/54c - 56m/55c floors to include partition, ceiling, and door removals as per plans. no change of use, egress or occupancy.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Suspended Scaffold installation for facade repairs and inspections
Facade Repairs. No change in use, egress, or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Interior renovation and vertical combination of apt. 1h and 2j. new stair between first and second floor. no change of use, egress or occupancy. combining 2 apartments comply with tppn 03/97.
Interior work on floor 2-15; including the upgrading of interior furnishings and finish of hotel guestrooms and corridors. no change in use, egress or occupancy.
Application is filed for interior removal of non-loadbearing partitions, ceilings, flooring and finishes onfloors 2 - 6 of existing building as per plans submitted.there will be no change to use, egre...
Fixing of new closet door with partition including painting and other cosmetic work without touching structure,use,egress & occupany as per plan