Pool & Spa Permits in Manhattan, New York
905 pool & spa permits filed recently
905 permits
At 3rd floor tenant space, new sprinkler system as per plans filed herewith. no change in use, occupancy or means of egress. related filings m01261898,m01261900,m01261904
General construction plans filed herewith to show interior alteration within tenant space ste 11 on 11th floor in existing building. no change to use, egress, or occupancy.
Removal and installation of ductwork, diffusers, fans, a/c, and related mechanical piping on 8th floor office space as per plans. no change to use, egress or occupancy.
At 3rd floor tenant space, new sprinkler system as per plans filed herewith. no change in use, occupancy or means of egress. related filings m01261898,m01261900,m01261904
Filed herewith for nail salon fit out of existing retail space. no change to use, occupancy, or egress under this application.
Mechanical modifications in 8th floor commercial office space. no change to use, occupancy or egress
Sprinkler work for temporary space for Xantium Investments on 12th floor
Mechanical work related to the renovation of an existing commercial space in the cellar and first floor.
We propose to renovate existing commercial space to construct and install a new pharmacy. no change in use, egress, or occupancy under this application.
Renovations to retail_cafe space and modification to associated mechanical system as per plans filed herewith. no change in use, occupancy, and egress under this application.
Interior alterations to existing 6th floor commercial office space to include minor non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Interior alterations to existing 8th floor commercial office space. no change to use, occupancy or egress
Restoration at existing church including: new framing for future mechanical equipment new steel reinforcements of existing deteriorated spandrel beams and columns. no change to use egress or occupancy...
The proposed tenant improvement work is within a fully-demised / fire-rated office tenant space located on the 22nd floor. new interior partitions, ceilings, flooring, millwork and finishes. no change...
To propose interior renovation of existing commercial space on 001 floor with general construction work as per plan. no change of use, egress or certificate of occupancy.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Mechanical work associated with interior renovation of commercial space as per drawings. no change in use, egress or occupancy.
Sprinkler modifications for 15th and 17th floor commercial space as per plans filed herewith.
Renovation of existing commercial space on first floor with general construction: install new partitions, floor/wall finishes. relocate ada restroom as per plan. no change in use, egress or occupancy...
Renovation and rehabilitation of existing dwelling units and common spaces within a 7 story multi-dwelling apartment housing. no change to use, egress or occupancy.