Pool & Spa Permits in Manhattan, New York
906 pool & spa permits filed recently
906 permits
Proposed interior renovation for commercial space of existing mixed residential & commercial building with minor partitions work and floor finishes as per plan. No change in use, egress, or occupancy.
Filing herewith sprinkler work in existing first and cellar space, American Eagle Outfitter STORE NUMBER: 2477 SPACE NUMBER: 560. No change in use, egress or occupancy.
At 5th floor tenant space, removal and installation of interior partitions, finishes, ceiling, flooring as per plans filed herewith. no change in use, occupancy or means of egress. related filings: m0...
Sprinkler system modification for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.
AT 33RD FLOOR TENANT SPACE, installation of sprinkler piping and heads as per plans filed herewith. No change to use, occupancy, or egress.
Structural work to remove existing reinforcing steel from 23rd marketing floor (22nd Construction floor) for Common Fund space.
Renovation of existing retail space. installation of partitions with wall, ceiling and floor finishes. no change of use, egerss, or occupancy under this application.
Installation of Battery Charging room for E-bikes in the Sub-Cellar #1 tenant space (Whole Foods Market). No change in occupancy, use or egress.
Modification to existing mechanical system serving space. Reuse of existing VAV boxes and associated controls. Modification of ductwork as necessary to accommodate new layout.
Filing for interior reno of 32nd floor brighttower office space as per plans submitted herewith.
Modification to existing mechanical system serving space. Reuse of existing VAV boxes and associated controls. Modification of ductwork as necessary to accommodate new layout.
Renovation of existing retail space. installation of partitions with wall, ceiling and floor finishes. no change of use, egerss, or occupancy under this application.
Filing for interior reno of 32nd floor brighttower office space as per plans submitted herewith.
Installation of Battery Charging room for E-bikes in the Sub-Cellar #1 tenant space (Whole Foods Market). No change in occupancy, use or egress.
At 9th floor south and 10th floor entire tenant space, structural additions/modifications and installation of convienence stair from 9 to 10fl in conjunction with tenant buildout gc work as per plans...
Mechanical work for temporary space for Xantium Investments on 12th floor
ILLUMINATED, NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL.. SIGN WORDING: securespace SELF STORAGE
NON ILLUMINATED, NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL.. SIGN WORDING: securespace SELF STORAGE
Filing herewith soft removal at existing 16th floor space. No change in use, egress or occupancy.
Interior renovaition, installation of new non-load bearing walls, doors, wall and floor finishes, ceilings and millwork on 8th floor office space as per plans. no change to use, egress or occupancy.