Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
APPLICATION FILE TO INTERIOR RENOVATION EXIST. STORE AS REMOVE &REMOVE MINOR PARTITION, CEILING, FLOOR TILES AT 1st FLOOR FOR HAAGEN-DAZS ICE CREAM STORE AS PER PLAN. PLUMBING WORK UNDER SEPARATE APPL...
Modifications to existing LL provided wet system to accommodate the proposed architectural layout. Installation of new plumbing fixtures for the restrooms, janitors closet and kitchen area.
Renovation at existing restaurant. installing new bar, new countertops, new flooring, new interior finishes and new bathroom framing. plumbing to be filed separately. no other work proposed. no change...
Modifications to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
removal of fixtures as per plans
Modifications to existing LL provided wet system to accommodate the proposed architectural layout. Installation of new plumbing fixtures for the restrooms, janitors closet and kitchen area.
File plumbing work for second floor commercial offices to install new plumbing fixtures. no change of use, egress or occupancy.
Interior installation of 14 plumbing fixtures including new hot water heater.
Modifications to the existing plumbing system on the floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy
Plumbing work associated with the interior renovation of the kitchen area only in apartment #9a including modification of fixtures, drain, and water/ sanitary lines. no change to use, egress, or occup...
Plumbing work in conjunction with interior renovation of apartment 4C. Work includes relocation & replacement of plumbing fixtures in kitchenette & bathroom and installation of new washer. No change i...
Renovation at existing restaurant. installing new bar, new countertops, new flooring, new interior finishes and new bathroom framing. plumbing to be filed separately. no other work proposed. no change...
Plumbing work in apartments as per plans. no change in use, occupancy, or egress.
Plumbing and sprinkler work for the renovation to existing units 5g, 10k, 15a as per plans filed herewith. no change to use, egress, or occupancy.
Hereby filing for the removal, replacement, relocation and installation of plumbing fixtures in apartment 8b located on the 8th and 9th floors. no change to use occupancy or egress.
Plumbing work includes removal of exisiting lavatory and Water closet; installation of new sinks, a dishwasher, new gas line.
Modifications to existing plumbing fixtures a per plans filed herewith. No change in use, egress or occupancy.
Lady m--installation of plumbing fixtures as per plans filed.
Plumbing work filed in conjunction with triplex apt renovation. no change in use, occupancy, or egress.
Hereby filing to install new plumbing fixtures with related piping on new raised deck as shown on plans filed herewith. No change to use, occupancy or egress.