Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Replace some existing plumbing fixtures with new, and install some new. All as per accompanying plans. No chance in use or occupancy.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Removal of existing fixtures and replace with new in 1st and 2nd floor bathrooms. Modification of existing sprinkler system . No change in use, egress or occupancy.
Herewith filing for interior demolition of existing plumbing fixtures in the subcellar #1 as per plans. no change to use occupany or egress under this application.
Plumbing and Sprinkler work filed in conjunction with OT application to renovate unit 7E.
Plumbing work for existing restaurant renovation.
Provide drinking fountains at two locations.
Disconnect and remove all plumbing connected to the bathroom and pantry fixtures on the 1-2, 5th Floor as per plans (Hines Demo Project.) No change in use, egress or occupancy.
Renovation of kitchen and bathroom in apt 97. fixtures to be replaced in same location.
Installation of new plumbing and sprinkler fixtures and fire hose station removal and installation
Plumbing work for this filing.
Plumbing work for this filing.
Mhb gn behavioral health: plumbing and sprinkler modifications to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy.
Plumbing work in conjunction with the interior renovation of an existing dwelling unit 12 on the 012 floor. no change in use, occupancy, or egress
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
Modification of 4 sinks, 1 water closet, 1 washing machine and 1 hot water heater.
Installation of plumbing fixtures as per plans. no change to use, egress or occupancy filed under this application.
Filing for plumbing work at unit 10A on the 10th floor. NO change to use, egress, or occupancy.
Demolition and installation of core restrooms fixtures, installation of new plumbing fixtures in 19th floor interior fit out. Installation of new sprinkler heads and related piping.
Herewith filing for plumbing modifications for carbon capture as per plans.