Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Interior demolition/partition work to be done on existing 11th floor of12 story commercial building. no lighting, mechanical, or plumbing to bedone under this application.no change in use, means of eg...
Partial demolition of non-load bearing partitions, doors, floor & wall finishes. New work is new doors, flooring, remodeled Kitchen & Bathroom finishes, hard wired SD/CO detectors. Plumbing to be fill...
Plumbing work as shown on plans
Plumbing modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
herewith filing application for interior renovation of Apt.2B with work to include Minor Demo and Build-Out of partitions. Plumbing and Mechanical applications to be filed under separate applications.
Removal and installation of plumbing fixtures and associated piping for the 8th floor office space as per plans. no change to use, egress or occupancy.
Hereby filing plumbing work and new sprinkler service at existing 4 family residence as per plans
Plumbing scope associated with renovation/ repair of existing elevator shaft.
Demolition of existing domestic hot water system & associated piping as shown on plans; relocation of plumbing risers and new installation of plumbing fixtures systems in conjunction with gc dob# m005...
Installation of plumbing fixtures including installation of new gas-fired cooking equipment in the existing kitchen on the 1st floor w/ existing existing type i exhaust hood installed under alt ii #10...
Plumbing modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Minor partition work for construction of new closets for existing bedrooms and new finishes within existing master bathroom and guest bathroom. plumbing work filed under subsequent application.
Modifications to the existing plumbing fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Propose plumbing work as per drawings filed herewith.
Plumbing work from the 3rd to the 5th floor as plans filed herewith. no change in use, egress, or occupancy.
Interior demolition/partition work to be done on existing 11th floor of12 story commercial building. no lighting, mechanical, or plumbing to bedone under this application.no change in use, means of eg...
NEW REAR EXTENSION AND ELEVATOR AND STAIR BULKHEAD; COMBINE WITH OTHER BUILDINGS ON THE LOT AND CHANGE USE FROM RESIDENTIAL TO OFFICES. NO DWELLING UNITS IN THE BUILDING WILL BE OCCIPIED DURING CONSTR...
Plumbing modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Modification to the existing plumbing system on the 17th floor as per plan. no change to use egress or occupancy
Minor alteration per plans filed within. No change to use, egress, or occupancy.