Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Plumbing work to apartment 7d as per plans filed herewith. no change to use, egress or occupancy.
Interior fit-out of existing residential unit 1g proposed. install new plumbing fixtures. no change of use and occupancy under this application.
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
Plumbing work on the 51st floor (Safehold) as indicated on drawings.
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
M520_Remove existing water fountain and replace with new bottle filler. For new Hydroponics Lab, provide new sinks, trap primer, floor drains, hose reels, hoose bibb, reverse osmosis filter, and all a...
Installation, relocation and replacement of plumbing fixtures as shown on plans filed herewith.
This application is filed for plumbing work in conjunction with general work type (ot) application #m01292009-i1.
Perform plumbing modification work inconjunction with apt#3j renovation. install, replace and relocate plumbing fixtures. no change to use, egress, occupancy or fire protection. general construction w...
Job filed for apartment interior renovation with minor plumbing fixturereplacements in kind. no change of use, egress, or occupancy under thisapplication.
Replace existing pl fixtuers with new as per drawings. no change to use, occupancy or egress proposed under this application.
Proposed new installation of new bathroom fixtures at cellar.relocate existing bathroom at 1st floor as per plans. existing electrichwh to remain. no change to egress, use or occupancy under this appl...
Plumbing with the renovation of existing duplex apartment #4 on the 2nd & 3rd floors. as per plans filed herewith. no change of use, egress, or occupancy.
Proposed relocated plumbing fixtures on 1st floor(apt. #1). no change in use, egress or occupancy.
Subsequent filing for replacement/new plumbing fixtures for an existing dwelling unit 7g. no change in use, egress and occupancy.
Proposed non-structural interior modification including modification at the kitchen and bathroom along with interior finish modifications throughout. no change in use, egress, or occupancy is proposed...
Plumbing modifications taking place on the 9th floor (9KN) as per plans filed herewith. No change in use, egress or occupancy.
Plumbing work for new mainttenance & operations building (m&o#3) in east river park to inlcude installation of 4 wet connection, 4 rpz and water meter with assoc. valves, 4 dia. d.i. piping
Proposed plumbing work to replace gas stove on existing piping, and to replace sink and dishwasher on existing roughing. no change in use, egress or occupancy.
Remove and replace existing plumbing fixtures and existing gas range at apartment 17B. Install new Washer/Dryer.