New Construction Permits in Manhattan, New York
308 new construction permits filed recently
308 permits
Construction fence as per drawings during nb construction filed, sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permi...
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Equipment use: single 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Structural filed in conjunction with nb # m01257465-i1
Structural in conjuction with new building job number # m01042409-i1
Proposed one story maintenance and operation pre-fabricated 968 sf new building in east river park.
Foundation filed in conjunction with nb m01257465-i1
Support of excavation filed in conjunction with nb # m01257465-i1
Structural filed in conjunction with nb # m01257465-i1
Proposed one story maintenance and operation pre-fabricated 968 sf new building in east river park.
Structural in conjuction with new building job number # m01042409-i1
Support of excavation filed in conjunction with nb # m01257465-i1
Equipment use: single 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Foundation filed in conjunction with nb m01257465-i1
Installation of temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Temporary multi point suspended scaffold as per drawings during nb const, filed sep. multipoint suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under th...
Installation of temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Temporary multi point suspended scaffold as per drawings during nb const, filed sep. multipoint suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under th...
Temporary standpipe system filed in conjunction with nb job number m00785688-i1.