Roofing Permits in Bronx, New York
602 roofing permits filed recently
602 permits
Scaffolding and needle beams installation at the exterior facades and supported scaffold inside the elevator and stair shafts from the 3rd floor to the roof level.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Scaffolding and needle beams installation at the exterior facades and supported scaffold inside the elevator and stair shafts from the 3rd floor to the roof level.
Roof protection of adjacent properties in relation to nb application:#x01047507-i1
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Rooftop solar installation. no change to use, occupancy or egress.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.28kw
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Filing to install outrigger and material hoist on roof for the facade work.
1400 PELHAM PARKWAY SOUTH new steel framing at south wing eighth floor for new roof over seventh floor corridor. provide new steel framing for new slab penetration at eighth floor mechanical room. Rai...
Structural modifications including new slab infills, new interior concrete pads, new wep openings in slab and in masonry wall and new steel dunnage on the roof as indicated on the plans filed herewith...
Structural modifications including new slab infills, new interior concrete pads, new wep openings in slab and in masonry wall and new steel dunnage on the roof as indicated on the plans filed herewith...
Installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.28kw
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Filing to install outrigger and material hoist on roof for the facade work.