Roofing Permits in Bronx, New York
602 roofing permits filed recently
602 permits
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Repairs to bulkhead at roof level including masonry repointing, brick replacement, and roof repairs.
Replacement of windows and doors, repair of sidewalk vaults, repair of cellar walls, replacement of roofs, and interior repairs. repair of exterior masonry.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Repairs to bulkhead at roof level including masonry repointing, brick replacement, and roof repairs.
T-Mobile modification - Install 2 antennas, relocate 2 antennas and relocate 2 RRU on the roof. Install 2 cabinets on existing steel platform on the roof.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of roof protection for adjacent property protection during construction in accordance with nycc 2022 chapter 33 building code. no change in egress, use or occupancy.
New railing installation at mechanical room roof, and brick masonry wall repair.
Renovation of a kitchen and replacement of roofing. See mechanical and structural filings for additional work. Not change in uses, means of egress or occupancy under this application.
Removal of existing asphalt roof shingles and replace with new at steep roofs. Removal of IRMA roofing and installation of SBS built-up roofing. Interior repairs and painting.
Nstallation of a temporary roof protection as per plans during new building construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Interior renovation inside existing retail space @ 1st fl to propose a take-out restaurant (burger spot). work to include refinish floor, new exhaust hood with related duct work and exhaust fan @ roof...
Mechanical work (direct replacement of (1)hvac roof top unit).**no change in use, occupancy, or egress is involved under this application**
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.