Renovation Permits in Bronx, New York
805 renovation permits filed recently
805 permits
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Minor renovation to existing bank branch including partial removal of non-load bearing, new partition work, new lighting at ceiling and associated finish work. No change in use, egress or occupancy.
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Facade repair, includes window lintels, spot re-pointin and mosnry cracks repair. no changes ot uses, egress.
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
provide new concrete pads for new Condensate return units and columns repairs as required
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Apartment alteration. No proposed change: egress, use, occupancy, zoning, or room count.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Suspended scaffold in order to perform exterior facade repairs and close-up inspections. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Facade repair, includes window lintels, spot re-pointin and mosnry cracks repair. no changes ot uses, egress.
provide new concrete pads for new Condensate return units and columns repairs as required
Minor renovation to existing bank branch including partial removal of non-load bearing, new partition work, new lighting at ceiling and associated finish work. No change in use, egress or occupancy.
Heavy duty sidewalk shed during facade repairs filed under application #x01141502-i1, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Install heavy duty sidewalk shed for remedial repairs. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Interior renovation to 113x consisting of general construction for auditorium repairs as per plans filed herewith. no change to use, egress or occupancy.
Proposed interior renovation converting existing 4 story and basement, into a 10 unit residential building