Renovation Permits in Bronx, New York
805 renovation permits filed recently
805 permits
Facade repair as per plans filed herewith. no change in egress, use or occupancy.
It is proposed facade repair work. no change to use, egress or occupancy.
Facade repairs to address fisp conditions as per plans filed herewith. No change in use, egress or occupancy.
Facade repair as per plans filed herewith. no change in egress, use or occupancy.
To correct the final certificate of occupancy 200922537F along with the limited renovation on the cellar, the second floor, and the third floor.
Facade repair as per plans filed herewith. no change in egress, use or occupancy.
Interior renovation of existing 2 family house. no change in use, egress or occupancy.
It is proposed facade repair work. no change to use, egress or occupancy.
To correct the final certificate of occupancy 200922537F along with the limited renovation on the cellar, the second floor, and the third floor.
Facade repair as per plans filed herewith. no change in egress, use or occupancy.
Facade repairs to address fisp conditions as per plans filed herewith. No change in use, egress or occupancy.
Repair of garage.
Heavy duty sidewalk shed during bldg renovations filed separately under application# x00980624. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this a...
Interior renovation on basement floor recreation room as per pda00011756.2. work includes replace floor with tiles. no change in use, egress or occupancy
It is proposed facade repair work. no change to use, egress or occupancy.
Renovation of 14-story building as part of the nycha pact renovation: horizontal enlargement of lobby, remove and dispose of non-bearing partitions; remove and replace finishes, fixtures, and doors as...
Parapet repair work as per plans to comply with violation # v062125ccer01dy; and ecb violation # 35667908n. no change in egress, use or occupancy.
Foundation and Earthwork in conjunction with renovation, expansion of existing two (2) Story Building. No Change in egress use or occupancy.
Structural system for proposed 2-story building and alteration. No change in, zoning egress use or occupancy.
Replace/repair/maintain existing bricks at exposure #4 facade inorder to resolve ecb violations. no change in use, egress or occupancy