Plumbing Permits in Bronx, New York
725 plumbing permits filed recently
725 permits
Hereby filing plumbing work at 5th floor unit 5h & 5g as per plans
Filing for plumbing work as per plans
This application is being filed for plumbing work only.
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Herewith filing for plumbing renovations as per plans. no change to use, occupancy, or egress.
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Hereby filing plumbing work at 5th floor unit 5h & 5g as per plans
Interior plumbing work. removal of all gas meters servicing 26 apts and piping , the system will be transformed from each existing apt gas meters to individual meter located in the basement. no change...
This application is being filed for plumbing work only.
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Filing for plumbing work as per plans
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Herewith filing for plumbing renovations as per plans. no change to use, occupancy, or egress.
Interior renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Plumbing work in conjunction with GC application #X01323493-I1
Modification of plumbing fixtures in cellar as shown on submitted plans. No change in occupancy, use or egress.
Plumbing work in conjunction with GC application #X01323493-I1
Interior renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Modification of plumbing fixtures in cellar as shown on submitted plans. No change in occupancy, use or egress.
Sprinkler, plumbing, and standpipe scope of work in conjunction with new building.