Roofing Permits in San Francisco, California
1,302 roofing permits filed recently
1,302 permits
reroof with hot work.
revision to bpa:2025-0728-1762 per field conditions: ground floor: add two grade beams and 2 shearwalls (same location as previously approved) and sump pump; second floor: add shear wall; roof: add on...
revsion 201802131144; (e) framing at main house roof to be demolished. (n) roof to be rebuilt in kind to match (e) roof
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing: remove 500 square foot shingles and install new underlayment paper and install 30 years lammark shingles gta, reference#202601284702
remove 1 piece plywood on the back to the roof end, install 1 new piece plywood, reference #202601284705
install (n) cabinet with (12) n batteries, install (n) 19"rack, remove 3(e) antennas and radomes and install 6(n) antennas with randomes and install (n) breakers located on roof
reroofing no hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing: replace (e) 5,000 sq ft roof w/tpo roof system. no hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
roof level: fire only work for the elevator modernization of cars 2 and 3 at the roof level machine room under 202112154499. additions are 1 smoke detector and 2 modules.
solar permit: installing 38 solar pv modules, 430 watts per module, total no. of rating 16.34 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capaci...
reroofing no hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
100% affordable. non structural rehabilitation of 108 units. exterior work: repair (e) windows, new roof layer.interior: remove finish hall flooring, (n) ada mobility/communication units, disable/remo...
re-roofing with torch down.
exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of buildin...