Pool & Spa Permits in San Francisco, California
204 pool & spa permits filed recently
204 permits
structural repair in the crawl space. replace brick, add footings with concrete pad footings. add wall anchorage. add simpson panel with concrete grade beam. voluntary strenghthening.
revision to 202311030091: new livable space at 1st/f, kitchenette, bathroom, & 2 bedrooms
30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space
expansion of (e) closet into garage space. replace (e) two rise steps at rear and propertry line wall. stairs are no more than 30" above grade.
31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall...
e) restaurant equipment to be relocated w/ new type 1 hood. modify e) back counter & provide cooking equipment on north wall of tenant space
exterior building repairs to entryways, landing, patios, balconies and garage doors. remove existing gate at entry and install new door. 30 espanola unit 2 to receive avi upgrades (ada)
exterior building repairs to entryways, landing, patios, balconies and garage doors. remove existing gate at entry and install new door. 10 espanola unit 1, 20 espanola unit 2 to receive avi upgrades...
tenant improvement demo (e) women's & men's restrooms and convert women's to multiple all gender restroom, convert men's restroom to amenity workspace in conference room add kitchenett and new finishe...
renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water d...
voluntary structural strengthing at ground floor, 5/8th tr bolts 7" embedment, 32'oc spacing 1/2" structural 1 plywood nailed at 6'edge 12' field.
interior remodel (no changes to exterior facade) including additon of 2 new baths, 1 new office space @ garage. associated structural work as required.
common area: voluntary addition of vertical balusters to horizonal rails modification to (e) back stairs. no visible. 4" max spacing between slats.
convert (e) recreation space into adu via state adu per planning code 207.2. add (n) bedroom and kitchen, existing 1-bedroom, 1-bathroom, 1-home office.
as built 202510318621- riser location moved, garage spacing changed from 100sf to 79sf, ups and downs moved, beams removed from main bedroom, pipe and head layout changed throughout the project
infill addition at rear under 1st fl of existing house overhange and deck. addition to be for new sauna and new toilet room, non conditioned space. addition=85sf
build new 304 sqft pool with 54 sqft spa in the backyard. pool and spa will be covered with astm certified safety cover and pool/spa related equipment, include gas meter upgrade.
addressing permit only: create the address 80 macalla road for treasure island bike path park/entrace to stormwater treatment space. southern entry point to stormwater garden called "buckeye grove"
2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included
fl b7: interior renovation retail space w/ new non-structural partitions, storefront, ceiling, lighting, millwork & finishes.