Roofing Permits in San Francisco, California
1,275 roofing permits filed recently
1,275 permits
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
solar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.50 kwh each in capacity, ess units will be closer than 3 feet | 27 kwh capacity energy storage system in...
revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scope
add 1 office/den and 1 bathroom on ground; add 1 bathroom on second floor. stair penthouse access new roof deck.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove existing roof shingles down to sheathing and install new comp shingles, no hot works
re-roofing: foam overlay - no tear off, no hot works.
solar permit: installing 16 solar pv modules, 410 watts per module, total no. of rating 6.56 kw. mounted: roof, ballasted: y, including 1 energy storage unit, with 13.5 kwh each in capacity, ess units...
reroofing: tear off (e) roof membrane. fasten fiberglass 28# base sheet & all weather empire base. apply 1 layer of flintastic iltraglass sa modified bitumen; replace all drip edge metal. torch apply...
2/fl- ref 202512192346- includes provide and install 5 fan coil units, run line set from units to heat pumps on the roof
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing - hot works.
re-roofing: remove existing roof, install asphalt shingles, no hot works
reroofing; tear off to deck replace with 1/4 densdeck- no hot works.
reroofing no hot work
renovation & expansion of (e) 1-story sfd into a 2-story 2752sf sfd and 268sf habitable roof open air roof deck. new construction of reinforced foundation and expansion of erection of structure, hards...
reroofing with no hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to pa# 201809170527. to complete substaintial renovation: bring new condominium units up to code, correct cumulative defects discovered during work progress. structural stiffening at roof lev...