Renovation Permits in San Francisco, California
4,007 renovation permits filed recently
4,007 permits
kitchen remodel on 2/f. new in-kind windows and exterior door in back and side facades. new lighting & outlets throughout. new den & bathroom on 1/f. new interior stairs from 1st floor to 2nd floor. n...
unit#1415: one kitchen, one bathroom remodel in kind, like for like
replace 3 street facing windows on the 2nd floor, double panel, double hung wood with exterior aluminum clading and same simulated lites. u<=0.28
extensive interior renovation 1st 2nd and 3rd fl. basement to have minor upgrade pertaining to (n) elevator, replace (e) windows and add (n) windows exterior and interior finishes to be replaced
unit 102: remove center bearing post. install new structural garage door header. replace 2 garage doors with one wider door.
t.i. improvement on the 27th flr. to include removal of (e) partitions, finishes, ceilings, and architectural elements. construction of new partitions and ceilings. mep deferred.
unit #408: two bathrooms like for like, two shower pans installations like for like shower to shower, no walls or layout changes.
bathroom remodel in kind no wall removal or layout change. replace 3 windows max .27 u- factor and 1 slliding door at rear not visible from street.
as-built for permit # 202511179721 to revise the pipe size of the riser from 4" to 2" inches update the hydraulic calculations accordingly 202511179721
1st floor: add 2 bedrooms, 1 full bath, laundry, media and home office. 2nd floor: remodel kitchen and bathroom. relocate bedroom & add 1.5 bath. rear addition: infill lightwell adn new patio at rear....
change drywall in living room, 2 bedrooms, dining room. all work interior. remove and replace in kind
replace fire alarm system to meet sf/ca code & add lf horns in units & add wireless radio monitor
5/f ste# 502: demo unpermitted partitions, loft, and doors. no new work at this time.
new horizontal addition, new vertical 4th story addition, add 1/f adu under state program.ss and remodel of existing t\hree stories.
revision to pa 202402296854, 202503172376, 202509125223 to remove material lift rom project scope. the change of use live entertainment programming was established under pa 202402296854
remove & replace stucco at front of the house.
dryrot repair front stairs less than 50%
basement addition: 2 bedrooms, 2 bathroos, laundry & utility. 1st floor remodel: 2 bedrooms, 2 bathrooms & 1 bar. 2nd floor remodel: 2 bedrooms, 2 bathrooms, addition living & kitchen.
landscape improvements on existing level 2 exterior terrace which includes: new planting, new bench, and replace synthetic turf with planting and paving.
replace (2) windows same size, same location. replace a few places of siding, less than 50% at rear of house. not facing street