Pool & Spa Permits in San Francisco, California
230 pool & spa permits filed recently
230 permits
light interior only refresh of three (3) amentity spaces within an (e) mult-family housing development work included minor reframing of selected rooms, new finishes, millwork and equipment. no changes...
partial remodel of bathroom: replace cabinets, remove whirpool tub and replace with corian pan, relocate light, fan, switch and outlet.
interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferre...
conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e)...
volunatary drainage improvement in crawl space, drain pipe and sump pump tie into (e) laundry waste.
38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occ...
conversion of (e)lower floors basement/ storage spaces of an existing 2-unit residence into a new adu(1011 sq.ft.)convert(e) 2 lower levels of storage/ basement areas into one(n)adu. add a new interna...
removal of unauthorized dwelling unit to comply with nov 202427911 - remove cooking appliance and electric wall heater to revert space to unconditioned for common use by tenants
renovate exterior stairs (less than 50% repair) at east side of the bldg to meet sb 721, add balusters and handrail. add pickets and graspable handrail to existing guardrail.
barrier removal work only to renovate existing restrooms to become an all-gender and accessible restroom at an existing retail space. no change to area, use, structural, exits, fire life and safety sy...
front bldg t.i. convert the space to a sandwich & coffee shop, no exterior work
1st fl, remodel (e) 1st fl space to new bedroom, and full bathroom
interior renovation: 1st fl - convert storage space into master bedroom, master bath & family room. total added habitable area: 480 sf. 2 new windows and 1 door at rear. no work on 2nd fl
rev202409040025 and deffered mep: arch changes-operable partition in multipurpose rm and removal of planters in basement lounge.relocate firewater pump to facilitage primign and access from a-rated co...
interior, ground floor remodel: change two, rear-yard facing rooms into sleeping rooms, construction of a 1-hour rated exit passageway, remodel of an existing bathroom, construction of a new bathroom,...
rear two story addition for new bedrooms. 1st floor: remodel 1st floor space to new media, new bathroom & new laundry room. 2nd floor: remodel (e) kitchen & (e) bathroom.
per legalization ord# 43-14, convert un-permitted in-law unit into a legal 2nd unit. install egress windows, smoke/carbon monoxide alarms. install landscaping per planning requirements, landscaping, p...
interior remodel on 3rd floor: convert unit #1 office space back to a dwelling unit.
new dwelling unit (adu) per california code section 65852.2, 1/f modify (e) space into adu (40a exeter st) includes (n) bedroom, (n) bath and (n) kitchen. new retaining wall at rear yard for adu windo...
convert existing garage into bedroom add 179 sf of conditioned/habitable space.